![]()
RUBBER TEST REPORT
The quality of our final products starts with raw materials. Major suppliers are subjected to on site audits by our Quality and Purchasing Personnel and must supply lot to lot test data and regular statistical summaries. From there, quality control continues. Using statistical process control methods and computer analysis, we perform quality checks of products and equipment throughout the manufacturing process Operator controlled SPC is used wherever possible. We monitor everything precisely before, during, and after the manufacturing process. Nothing is shipped unless it meets our rigorous requirements.
Many
of our automotive and appliance customers have audited our facility and procedures. We
have received excellent ratings. We welcome the opportunity for our customers to see our
manufacturing facilities, the quality of our products and our research and development to
discuss the key features of existing and future products.
We at
Horizon Rubber Products Ltd. are committed to total customer “Internal and
External” satisfaction by delivering quality product. We always improving our
selves through customer interaction, on mutually agreed terms.
Quality
Policy
We shall achieve Global Quality and Reliability Standards by :
Upgrading product Technology
Allocating resources to continuously improve processes & skills of people, and
Focusing on cost reduction through value Engineering.
This will be accomplished through total involvement of all levels of employees, vendors and business associates, there by ensuring a mutually beneficial relationship.
| S. NO |
TECHNICAL CHARACTERISTIC |
As
customer |
Obser. | Remarks | ||
| 1. |
|
- |
- |
- |
||
| 2. |
|
- |
- |
- |
||
| 3. |
|
- |
- |
- |
||
| 4. |
|
- | - |
- |
||
| 5. | Change In Volume In Astm.-2 Oil For 24 Hours At 100°C | - | - | - | ||
| 6. | Change In Volume In Astm.-Fuel -B 24 Hours At 50°C | - | - | - | ||
| 7. | Change In Volume In HSD For 24 Hours At 100°C | - | - | - | ||
| 8. | Change In Volume In Water For 48 Hours At 100°C | - | - | - | ||
| 9. | Change In Volume In Air For 48 Hours At 100°C | - | - | - | ||
| 10. | Change In Volume In Petrol For 24 Hours At Room Temp. | - | - | - | ||
| 11. | Change In Volume For Steam For 48 Hours At 100° | - | - | - | ||
| 12 | In Hot Air For 100 Hours At 120°C | - | - | - | ||
| 13. | In Cold Resistance For 2 Hours At 30°C | - | - | - | ||
| 13. | Compression set for 24 Hours at 30 | - | - | - |
DIMENSIONAL AND VISUAL CHECKS
| S.No | Nature of Check | Frequency of Test | Control Action |
| 1. | Visually Checked | 100% |
Meeting & Personal Interaction with Workers and Staff and other concerned persons to discuss reason for rejection when they occur. |
| 2. | Hardness | 50% (Out of every shift of every Machine |
|
FACILITIES
Laboratory: The unit has well equipped laboratory for conducting all types of physical chemical and Micro Structure Test etc to supply zero Defect Product.
Specific Gravity Test and Ash Content
Proper records and Documentation are being maintained on Regular basis
Calibration of all laboratory equipment's are being used to be done on regular intervals with proper Documentation
DIES MACHINE SHOP: Our Unit has engaged Qualified Persons to make dies for us as per drawing of our customer dies are designed and developed to suit the moulding machine keeping in view of the nature of items. These dies are subjected for regular check up and proper record and documentation have also been maintained.
Maintenance/Repairs of Dies are made if any spot found on moulding part at the time of visual regregation.
Laboratory
We understand that,to ensure
desired customers quality, a systematic and scientific test approach is
required at various stages of material flow. To fulfill this we maintain a well
equipped laboratory our aim is to give a Zero defect Product Totally tested for Physical,
Chemical and Micro structure Defects Our LAB is equipped with
Home :: Product :: Quality :: Customer :: Profile :: Mfg Floor :: Contact us --------------------------------------------------------------------------------------------------------- Engine and Transmission Mounting :: O Rings Rubber Bushes :: Rubber Boots :: Other Parts
|
|||||||||||||||||||||||